Showing posts with label Willesden Green Library. Show all posts
Showing posts with label Willesden Green Library. Show all posts

Friday, 5 July 2013

No poor people is selling point for new Willesden Green development


When we were campaigning against the Willesden Green library redevelopment we high-lighted that no affordable homes were to be built on the site once owned by Brent Council (ie our land). Brent Council argued that  Galliford Try/Linden Homes had to be sure of a profit in order to be able to build the Culltural Centre for zero cost to the Council so no affordable homes were included.

Now like a slap in the face for those on the Council's housing list, the estate agent advertising in Singapore has made the lack of affordable homes/key worker homes a selling point! Presumably this ensures prospective buyers have the right sort of neighbours.

EXTRACT FROM PUBLICITY LINK

THE LIBRARY @ WILLESDEN GREEN, LONDON
PRICE FROM GBP350,000 (SGD6xxK)

Willesden Green is one of North London’s liveliest and most cosmopolitan areas, whose excellent Zone 2 Jubilee Line connections really set it apart.

The Library takes a prominent position on Willesden High Road, and sets new standards in contemporary accommodation for the area. This exciting scheme comprises four buildings, offering ninety-five highly specified 1 and 2 bedroom apartments, many with balconies or terraces. The development is gated and has underground parking for residents: always a bonus in London.

SELLING POINTS:
• Prominent position on Brondesbury Road and Willesden High Road
• Next door to the forthcoming Cultural Centre
• Within 3-minutes ride to Zone 2 London tube station or 5-minute walk
• Within walking distance to Queens Park
• Willesden High Street is thronged with shops, supermarkets (Sainsbury’s Supermarket is a few minutes’ walk from The Library), cafes and restaurants and is a few minutes’ walk from Brondesbury Park
• Excellent transport links – Zone 2 Jubilee Line with direct connections to key interchanges including Baker Street, Waterloo, London Bridge and Canary Wharf
• No key worker/affordable housing (my emphasis)
• High quality fixtures, fittings and finishes
• Fully fitted kitchen by Symphony with integrated appliances and granite worktops
• Estimated Selling Price: From £350k (SGD 6xxk)

UNIT MIX:
Milne Place (Block A)
1 Bedroom: 545 sqft – 626 sqft
2 Bedroom: 759 sqft – 1005 sqft

Lewis Court (Block B)
1 Bedroom: 546 sqft – 554 sqft
2 Bedroom: 614 sqft – 862 sqft

Developer: Linden Homes and Green Urban
Address: 95 Willesden High Road, London, NW10 (Zone 2 on Jubilee Line)
Tenure: 999-years
Estd Completion: Summer / Winter 2014; 4Q 2014
Site Area: 83,958.50 sqft

CALL SALES HOTLINE: + 65 90933158 TO REGISTER YOUR INTEREST☎

Friday, 22 February 2013

A campaign worth fighting

We may have lost last night but it was a campaign worth fighting and no one can doubt the passion and commitment of KWG. KWG did manage to retain some of the Victorian building but most importantly gave notice to the Council/Developers that the community won't be walked over.

I hope that the sense of community and common cause created by the campaign will continue in some form in the future.

Congratulations,

Martin Francis

Thursday, 10 January 2013

Zadie Smith attacks loss of Willesden Green public square as 'cultural vandalism'

The Evening Standard reports today that local author Zadie Smith has stepped ino the debate about the Willesden Town Square application:
A council that closed half its libraries wants to demolish another to make way for new homes, then rebuild it on a cherished public square.

Brent residents are fighting plans to build 100 flats on part of the Willesden Green Library Centre site and erect a “cultural centre” on land in front.


Author Zadie Smith, who grew up in the borough, attacked the scheme as “cultural vandalism” and said the square is one of the few public places where locals can meet for free.


In the New York Review of Books, she wrote about visiting the square when it hosted a French market, saying people were “simply standing around in the sunshine, like some kind of community”.


Protesters claim the plan will result in the loss of a community “breathing space” where local events are held. They have applied for the land to be recognised as a town square. A public inquiry will be held next month.
Martin Redston, leading the campaign, said: “The public square is essential as one of the last pieces of open space in Willesden Green. It is sunny, but sheltered by a lovely old plane tree and looks out on to the 1894 heritage of the old library. It is a place where shoppers and workers can rest, pause and reflect. It is a safe place where parents can let their kids play without straying into main roads.”
Brent, which closed six of its 12 libraries despite residents’ protests, plans to give part of the existing library site to developers in return for them funding the new building, and said it was an “innovative opportunity” to get a new facility without direct investment.


Thursday, 3 January 2013

Willesden Green Library Centre – some New Year thoughts


Philip Grant has asked me to post this article:-
 
If Brent’s Regeneration Department had got their way, Willesden Green Library Centre would now be an empty building site, and the 10,000 local people who used its former building every week would be making do with small temporary facilities spread across the borough. The thousands of local residents who signed petitions, and the hundreds who have put in a lot of time and effort to fight the proposals, have ensured that this has not happened yet, and that even if the Cultural Centre plans go ahead, the 1894 library building will be retained. 

We can look back on 2012 with some satisfaction, but as we look forward to 2013 the key battles will come in the next few weeks. In order for the Cultural Centre scheme to go ahead, Brent’s Regeneration Department and Galliford Try Plc have three hurdles to overcome. I hope that these notes, and your own ideas and comments resulting from them, will help us to understand what needs to be done in order, hopefully, to see the scheme fall flat on its face.

1. The Town or Village Green application

The Public Inquiry on Martin Redston’s application to have the public square in front of the Library Centre registered as a Town or Village Green will begin on Monday 11 February. In my view, the square could meet all of the legal tests necessary for registration, and current chances of success are around 50/50, but it is up to the Applicant to produce the evidence necessary to prove his case. That is why Martin needs witness statements from as many people living within the Willesden Green area (the “neighbourhood within a locality” on which the application is based) by Monday 14 January at the latest, giving evidence which shows that they have used the square for leisure activities during the period from 1991 until May 2012 (or for whatever part of that period they have done so). It is very important that only genuine information and details are given, and that no one “invents” evidence thinking that this will help. Any statement which the objectors can show to be false, or the Inspector conducting the Public Inquiry considers likely to be false, will undermine Martin’s case by raising doubts about the validity of all his evidence.

Anyone is welcome to attend the Inquiry (from 10am each day in Space 2 on the first floor of the Library Centre – via the lift opposite the BAR Gallery). I hope that any supporters of the application will treat the proceedings with respect, as any placards or noisy demonstration would probably do more harm than good. From what we saw at the preliminary hearing, the Inspector appears likely to handle the Inquiry properly, and to consider the evidence and arguments of both sides fairly before reaching a conclusion. He hopes to produce his report and recommendation by the end of February. If he decides that the case for registration has not been sufficiently proved, I cannot see any point in trying to pursue this application any further. If he recommends that the square should be registered, Brent Council are not obliged to accept his recommendation, and could just sit on his report without taking any action on it. In that case it will be necessary to campaign publicly to shame Brent into registering this open space as a Town or Village Green, because it is only actual registration which protects the land from being built over.

2. Planning Application ref. 12/2924

Brent’s Planning Committee is likely to consider this application at its meeting on Wednesday 13 February at 7pm. The Planning Committee are not “the enemy”. They are independent of Brent’s Executive, and have a duty to decide applications on proper planning grounds and in accordance with Brent’s stated planning policies (unless material considerations indicate otherwise). There is a reasonable chance that they will reject the application, if the defects of the application are put before them.

Many of us will want to be there, and anyone who has commented on the application should receive notification of the meeting from Brent Planning Service. People should attend as individuals, carrying their notification; this is not the occasion for crowd action, placards or anything that could justify officials at the Town Hall barring the public from the meeting. We need to respect the committee proceedings, so that our views as well as those of the applicant and the Planning Officer receive a fair hearing.

The Planning Officer’s report and recommendation will be very important. It should be available to view online, as part of the meeting agenda documents, about a week beforehand. It will be a long and detailed report, and it needs to be studied very carefully. All of the points showing that planning policies have not, or not fully, been complied with need to be noted and referred to in objectors submissions to the committee, and any points where we disagree with the report over whether a planning policy is satisfied also need to be identified and brought to the committee’s attention. I think it would be a good idea if an individual or small team began listing these planning policy points now (from objections and comments already submitted), so that the list is ready to check against the Planning Officer’s report and be available to the KWG representatives who will speak as objectors at the meeting.

It is likely that a maximum of only three members of the public will be allowed to speak at the Planning Committee meeting, and probably for only two minutes each (one may be allowed three minutes). It is probably safe to assume that only two objectors will be allowed to speak, and to identify who would be the best two (with one “in reserve”) to speak clearly, concisely and confidently as to why, on proper planning grounds, the application should be rejected. Those two should notify the committee’s Democratic Services Officer, Joe Kwateng, at: joe.kwateng@brent.gov.uk that they wish to speak as objectors as soon as possible after the date for hearing of the application is confirmed, with the “reserve” sending an application as soon as those two requests to speak have been acknowledged. [I will not be putting myself forward as a speaker, as I think local people from Willesden Green would carry more weight – I will do what I can to ensure that several procedural matters are dealt with properly, including that of Cllr. Ann John as a member of the committee].

As indicated above, the key points to get across are why the application should be rejected on planning grounds. It might be best for one speaker to deal with the housing part of the application, and one to deal with the Cultural Centre points. They will need to work together to see who will have room in their two (or three) minutes to also include the planning policy failures on consultation, the fact that unlike the Civic Centre, WGLC is not in a regeneration area but in a district centre whose suburban character is meant to be protected under Brent’s own policy CP17, and the points arising from part of the site being in a conservation area (with the rest within that area’s “setting”). It will be a tall order to get everything into such a short time, by with careful preparation I think it can be done.

It will not be possible for the Planning Committee to grant full planning permission to this application at their meeting. If they are “minded to accept” the application, it will have to wait while the linked conservation area consent application is referred to the Secretary of State (see below). If the Planning Officer’s report recommends granting planning permission, the committee will not be able to reject the application at their meeting – they will have to record that they are “minded to refuse” the application, set out their grounds for this view, and then adjourn hearing of it to a later meeting. The only way that the application can be refused outright at the meeting is if the Planning Officer recommends refusal and they are satisfied that he is correct to do so. We do not yet know the recommendation will be (or whether, exceptionally in the particular circumstances of this case, there will be no recommendation) but the more proper planning grounds for refusing the application we can draw to the Planning Committee’s attention at the meeting, the better for our case.

3. Conservation Area Consent Application ref. 12/2925
This application cannot be decided by Brent’s Planning Committee, as despite its attempt to hide behind Galliford Try as the “sole applicant”, Brent is legally the joint applicant, at least as far as the proposed Cultural Centre is concerned. The conservation area consent application will only be considered by the Secretary of State for Communities and Local Government (or the planning advisors which recommend what decision he should make) if Brent’s Planning Committee are “minded to accept” the planning application. 

Brent’s Planning Service will have to submit all of the documents in respect of this application, including all of the objections and comments made on it, for consideration. There is nothing further that we can do to influence the outcome, and there will be no public hearing. The usual time for such consideration before a decision is given is, apparently, between 16 and 20 weeks, but can occasionally exceed six months in a complicated case. If the decision is to grant the application, this would then allow Brent’s Planning Committee to grant full planning consent.

Because the two applications have been combined in a single form and set of documents, it is difficult to work out what the conservation area consent application part of it actually consists of. When I managed to do so, in order to submit my detailed comments, I discovered that it is a total mess! The application form seeks permission for the partial demolition of just the southern extension of the 1894 library building, confirming this in its proposed demolition plans and Town Planning Statement, then puts forward plans for work involving the complete demolition of all internal walls and floors within the locally listed building. This and other contradictions in the documents, together with a failure to actually consider the tests which the application needs to pass before it could be accepted, means that the Secretary of State would have little option but to reject it.

Brent’s Regeneration Department are aware of my detailed comments on this conservation area consent application, and if they have any sense, they and Galliford Try will withdraw it and submit a fresh application in place of 12/2925. This would mean another public notice, providing a further 21 days to consider, comment on or object to their consent application. If they press ahead with the existing application, they may well trip over this hurdle, even IF they manage to clear the first two. That is a big “IF”, and something which is far from certain as long as we organise and prepare properly the cases in favour of the Town and Village Green and against the planning application.

Tuesday, 2 October 2012

Willesden Green Library on Brent Connects agenda this evening

Brent Connects replaces the Area Consultation Forums and the first Willesden session is this evening. Remember you can book a Soapbox to speak on a subject of your choice by arriving early and filling in a form.  Willesden Green Library Redevelopment is on the agenda.
 
College of North West London
Denzil Road
Willesden
NW10 2XD
 
Tuesday, 2 October 2012 7pm
 
Main presentations:
  • Recent smelly waste in Neasden/Wembley
  • An interactive community feedback session including
       - How Brent Connects works
       - New equalities duties and monitoring  
  • Central Middlesex Hospital's A&E service
  • Willesden Green Library Centre proposed redevelopment
 

Monday, 24 September 2012

Oliver Sacks: My happy hours in Willesden Green Library

Oliver Sacks, the  British biologist, neurologist, writer, and amateur chemist has written the following letter to the New York Review LINK



To the Editors:

Seeing the photograph of Willesden Library in Zadie Smith’s powerful article [“North West London Blues,” NYR, July 12] gave me a sudden start, and a rush of intense memories and emotions, for it was here that I spent many of the happiest hours of my growing-up years—our house was a five-minute walk from the library—and where I received my real education. I hated school, instruction, classes, and needed to feel free—free to look at the thousands, tens of thousands, of books in the library—to roam and to enjoy the special atmosphere and the quiet companionship of other readers, all, like myself, on quests of their own.

The tender and nostalgic memories evoked by the photo turned to rage and heartbreak as I read Smith’s account of the proposed demolition of the library, and its replacement by luxury flats.

It is true that one can get anything online now, and read everything at home, but there is nothing like a “real” book, and nothing like a library, especially a local library, which is an essential part of a living community. I hope something can be done for Willesden Library, and for public libraries everywhere, but one sees from Zadie Smith’s account of the dawn raid on Kensal Rise Library in London how even passionate communal support—volunteers to run the libraries, and chains of people to protect them—may be impotent to prevent their destruction.

Oliver Sacks
New York City


Monday, 3 September 2012

The 1989 Library Vision - what we have lost

We have managed to get hold of Brent Council's leaflet advertising the opening of the 1989 Willesden Green Library. Clearly this building had EVERYTHING  including a community bookshop. See what we have lost....


Wednesday, 8 August 2012

First drawings of Willesden Green redesign

Retained library scheme from Brondesbury Park 
Ground Floor
First floor
   
Second Floor
My apologies for the quality. These were photographed at today's consultation.

Monday, 2 July 2012

Willesden Town Square vibrant with the French Market

The French Market last week

The much smaller space under redevelopment proposals
The open space and proposed Town Square outside Willeseden Green Library Centre was vibrant with colour last week as the French Market took place.

The open space in the front of the Library will largely disappear when the new Cultural Centre is built and will be replaced by one BEHIND the building, between the new flats and the Cultural Centre. It will be in the shade and the public will not be able to see it from the High Road.

Objectors to the Town Square application have until July 20th to submit their views to Brent Council. Meanwhile these photographs speak for themselves.



Saturday, 19 May 2012

Main points for objections on conservation grounds

Philip Grant has prepared a document which highlights the main points to consider for objections on conservation grounds to the Willesden Green Library planning and conservation area consent applications. It was shown briefly at the meeting on 15th May, but is available below for those who wish to refer to it more closely, and for anyone who was not able to attend that meeting.

Tuesday, 21 February 2012

Willesden Bookshop: The council "don't know what they've got"

From the Bookseller LINK

Willesden Bookshop is searching for new premises after Brent council plans to develop the Willesden Green Library Centre, where it is based, into a "brand-new multi-million pound cultural centre" led to the termination of its tenancy.

Brent said the new "Willesden Green Cultural Centre" will be a state of the art cultural centre and library that will act as the main hub for council services and community activity in the south of the borough. WGCC is to be delivered "at no capital cost to taxpayers thanks to a deal struck between Brent Council and Galliford Try, one of the UK's leading construction companies, to build homes for market sale at the back of the site in return for the centre," the council said.

Work on the new centre is expected to start in September with a completion date of  spring 2014. The existing Willesden Green library building is set to be demolished as part of the process and there will not be a place for the Willesden Bookshop in the new development.

Steve Adams, owner of 25-year-old bookshop, which has a strong children's section including a specialism in multicultural books, said the council had terminated the shop's lease but given it a temporary extension to August. "We are looking at local alternatives but we are fairly gloomy because local rents are amazingly high," he said. "The trade is in a state of crisis and it is very hard to be confident at looking at a new 15-year lease on commercial premises when you are probably looking at a declining market."

Adams said there was strong local opposition to the move, with over 1,000 signatures to a petition asking for the bookshop to be retained. "That's from local customers, we've been very touched," he said.

A council spokesperson said: "The council is aiming to deliver the new cultural centre at no cost to the taxpayer and it is not financially viable for the bookshop to [be] given a preferential rent there. We recognise it has many valued customers and is an important asset to Willesden Green, so we will provide as much support and assistance as possible to help them find alternative premises. Discussions about this have already begun."

Brent resident and literary agent Geraldine Cooke said: "The mealy-mouthed message from the council is an absolute disgrace. They have never begun to realise that Willesden Bookshop is providing a service to the community, not only because of the cultural diversity of its stock and the tremendous knowledge of its staff but because it also supplies most of the educational texts to all the schools, nurseries, colleges and libraries of this borough. They don't know what they've got."

Wednesday, 15 February 2012

Make your voice heard on Willesden Green Regeneration - this Thursday

Kings Hall
'Keep Willesden Green, a group of concerned residents, will be holding a public meeting about the proposed regeneration of Willesden Green Library Centre on Thursday 16th February, 7pm, Kings Hall, Harlesden Road, NW10 2BS (corner of Kings Road). The meeting will bring people together to share concerns and will hear from Andy Donald, Director of Major Projects and Regeneration as well as campaigners on the bookshop and preservation of the Old Willesden Library.

We hope this will be the start of a dialogue in which residents can have a voice and help shape the future of the area.

MAP

Monday, 13 February 2012

Useful Handbook for campaigning

This Handbook on library campaigns has a lot of useful information that may be of interest. Follow this LINK

Sunday, 12 February 2012

Speakers on Willesden Green development at Executive tomorrow

Several local residents have requested permission to make 3 minute presentations at the Brent Executive meeting on Monday evening. They are likely to be taken at the beginning of the meeting after apologies and minutes.

The meeting begins at 7pm on Monday 13th February in Committee Rooms 1,2 and 3 (at the top of the stairs).

The members of the Executive are:
Cllr John (Chair) Leader/Lead Member for Corporate Strategy and Policy
Co-ordination
Cllr Butt (Vice-Chair) Deputy Leader/Lead Member for Resources
Cllr Arnold Lead Member for Children and Families
Cllr Beswick Lead Member for Crime and Public Safety
Cllr Crane Lead Member for Regeneration and Major Projects
Cllr Jones Lead Member for Customers and Citizens
Cllr Long Lead Member for Housing
Cllr J Moher Lead Member for Highways and Transportation
Cllr R Moher Lead Member for Adults and Health
Cllr Powney Lead Member for Environment and Neighbourhoods

Cllr George Crane will probably comment on the regeneration  proposals with possible additional comments from Cllr James Powney who leads on libraries.

Among the issues that have emerged about the regeneration proposals are:

  • Lack of consultation over the original proposals and the 'offer' to be made in the proposed Cultural Centre
  • The handing over to developers of council land to finance the development with all profits from housing going to the developer
  • The Council-Private Partnership which leaves a lot of decision making to the developer
  • The developer's apparent decision that retail in the Centre would not be viable (despite provision for a cafe when there are many available in the vicinity)
  • The subsequent loss of premises to the much valued Willesden Bookshop
  • The developer's advice that the historic old  locally listed 1894 Willesden Library could not be accommodated in the new plans
  • The subsequent loss of  a base for the Brent Irish Advisory Service
  • The apparent lack of public meeting rooms in the new Centre when the current rooms have been well-used and are essential to local democracy
  • Provision for council offices in the new building when other offices are being closed and moved to the new Civic Centre
  • The adequacy of the council's alternative arrangements during the 18month-2 year building period and proposals to reopen some of the closed libraries instead
  • Loss of the open space in front of the library
  • Lack of parking spaces for disabled visitors

Monday, 30 January 2012

Willesden proposals: reasons to be angry


Willesden Sunset by local artist Tim Danby
Posted on behalf of a Willesden Green resident:

Brent Council has not consulted on this scheme. This is why so many local residents, like myself, are angry.  This is one of the reasons for the  'call in' meeting by a group of councillors on February 1st. This is why a growing number of us are determined ensure our views are taken into account and decisions no longer continue to be made with as little public scrutiny as possible.

Brent Council's proposals, which are already far advanced,  have been made by a group who do not represent in age, ethnicity, social class and political power the people I see in the library. The Vision Statement is a shabby piece of PR; the current library could achieve all that is listed if it were properly managed.

When I asked a library assistant about the proposals two weeks ago, she knew nothing about it, nor could give me any information! Why were there no plans in the library? An opportunity to talk to a representative from the Council about this exciting new vision?

We had at least two mailings about the small alteration to the junction of Staverton Road and Brondesbury Park with detailed plans and opportunities for feed-back. Why were residents sent nothing at all about the redevelopment of our library centre?

Friday, 27 January 2012

Harrow resident stunned in Willesden

I was passing the Willesden Green Library Centre a couple of evenings ago after leaving the Rising Sun. I was accompanied by someone from Harrow who was absolutely flabbergasted when I told her that the building was due to be bull-dozed.

"But it looks modern!" she gasped.

She was even more stunned when I told her the bookshop was to go and would not have a home in the new development.

Then of course I told her that the beautiful old Willesden Central Library building she was admiring was also going to be knocked down...

Sometimes it takes an outsider to see things as they really are.

Thursday, 26 January 2012

Why I am worried about the regeneration proposals

The Library and Bookshop due to be demolished
 Guest posting  from Sophia MacGibbon, a Willesden resident who spoke at the recent Willesden Area Consultation Forum. There will be an Executive report on the Willesden Green Library Regeneration at tonight's Council Meeting, 7pm, Brent Town Hall

I have a number of concerns about the Willesden Green Regeneration proposal as outlined by the Council


I find it hard to see what exactly is being proposed. The document is full of good sounding phrases, but short on what they actually mean. Because of that I cannot see whether the proposed development is going to give the people of Brent more than they are getting now. In fact all the vague proposals could be delivered in the existing structure with better management and some investment in improved technology. 


I am worried about the proposal for a number of specific reasons:-


1 The proposal will, I believe result in the demolition and loss of the original library building, currently housing an Irish Advice centre. This building is an historical and architectural gem and these are in short supply in Brent. It would be an act of vandalism to destroy it      


 2. The loss of car parking space. I know it is environmentally fashionable to knock car use and proposals that appear to make bringing cars into the town centre more difficult should be the current good thing to do. However I believe the councillors should study the finding of the survey undertaken for the Government by Mary Portas.  She argues strongly that for local high roads to stand a chance against shopping centres etc, there has to be parking provided at minimal cost. While it is possible to park at Sainsbury’s, the space is limited and I fear that many of the shops further along the High Road will lose custom if the car park at the library were to go. Many people park, use the Library centre and then nip out to the local shops. What rate benefit the council might accrue from residential development of the parking space may well be offset by the loss of business rates if yet more shops close down. And the negative impact on the High Road could be devastating.

The closure of 6 of the borough’s libraries has meant that may people have to travel considerable distances to get access to a library. The loss of the car parking facility will hit the elderly and people bringing young children to the library to enjoy the under5s sessions, etc. These sessions are an important way of developing a love of books and a confidence in using libraries. The closure of the car park could be argued as discrimination as it will impact on some sections of the population more than others


3. The loss of the open space at the front of the library centre will be a shame, especially as there is beginning to be a real effort to use the space more frequently and imaginatively. There is an ongoing attempt to establish a regular market there that has the potential to become successful, there things take time, and the current sculptural art work is a delight.  The High Road is mainly narrow and quite dark, the open space around the library is a welcome break of light and air.


4. What is wrong with the current building? I read in the proposal document that it is expensive and not fit for purpose. In what way is it not fit for purpose? Everything that seems to be being proposed could go on in the existing centre if it was properly managed. Currently many of the features of the current building are idle. Why? How come people have been able to establish a successful cinema in most unlikely premises in Kensal Rise, (The Lexi) while the purpose built cinema with a car park is unused? Good management should have dealt with that in a way that could have been profitable to the council. Likewise the bar/cafe area.  Cafe culture is rapidly growing all round the borough and that cafe should have been a successful and profitable business, bringing rent revenue in for years. A recent successful art/craft project showed the real potential of the space. The underused upstairs spaces could have been utilised in ways envisaged in the proposals for redevelopment.  The current centre is expensive because it is underused and little imagination has been shown both to exploit the space and make money out of it. If a new centre is built what guarantee is there that it won’t be poorly, expensively and unimaginatively managed.


5. The loss of the bookshop. Bookshops are struggling across the country and having one still surviving on the High Road is to be applauded. The High Road is increasingly reducing to pound shops, all hours’ grocers and fast food outlets. Any shops that provide variety and in the case of the bookshop, culture should be encouraged and supported. While attempts to get current unused shops available at reduced rents, there are only to be for a limited period and this proposal is not a permanent solution for a shop such as the bookshop. The shop provides an invaluable service to many local schools as it deals with their book orders. The schools will struggle if the shop goes.


6. I fear for the future of the library aspect of the proposed centre when I see the current provision described as “warehousing books”. What is being proposed, a library without books? Already much of the library space is taken up with the provision of a free internet cafe. While I think the provision for study space, including internet provision is invaluable, much of the current space is not used for that, but by people sending emails. Moreover student study space is not the only use of the library and despite the increasing use of eBooks; hard copy books are still the central purpose for libraries and will be for many years to come. If in the future technology proves me wrong, it will require a small investment to upgrade the provision.